Industrial and Warehouse Refurbishment Project for DHL

Comprehensive Restoration Project

do you have a project we can help with?

East Midlands

In November 2024, we undertook a full-scale refurbishment and industrial cleaning operation at a large warehouse facility that had been temporarily decommissioned. With unrestricted access to the site, our team transformed the entire space, inside and out over several intensive weeks.
 
 
This project required strategic planning, specialist equipment, and a coordinated team of skilled professionals. From high-level cleaning to precision painting, we revitalised every functional area to meet high standards of cleanliness, safety, and presentation.  The project included;
 
Deep External Restoration:
We carried out a thorough deep clean of the entire exterior structure, removing accumulated grime, organic build-up, and airborne pollutants to restore the façade and perimeter to a pristine condition.
 
Car Park Regeneration:
The onsite car park underwent a complete transformation, including pressure washing, debris removal, surface detailing, and visual enhancement—ensuring it aligned with commercial-grade standards.
 
Interior Industrial and High-Level Cleaning:
Our specialist team tackled internal cleaning across vast floor spaces, mezzanine levels, and overhead structures using advanced equipment. This included degreasing, dust removal, and sanitation of surfaces inaccessible via conventional methods.
 
Professional Commercial Painting:
We meticulously repainted multiple structural and functional elements to improve durability and visual appeal:
  • Loading bays
  • Internal and external staircases
  • Gates and perimeter fencing
  • Bollards and protective safety barriers
  • All main entrance doors to the building
Selective areas within the warehouse interior were refurbished and detailed to improve operational readiness—supporting the site’s future reoccupation, leasing or asset value.
 
A site underwent a striking visual transformation with enhanced safety, hygiene, and asset presentation. The site was delivered in a revitalised, market-ready condition—with no disruption and full compliance.

Project Details

DATE

November 2024

CLIENT

DHL Distribution Centre

PROJECT TYPE
SERVICES
  • Deep cleaning of exterior warehouse
  • Car park cleaning
  • Interior Refurbishment and Cleaning
  • Commercial Painting
LEARN MORE

Project Gallery

Infrastructure Painting at Industrial Warehouse

Request A Quote Today

Do you have a project that needs enhancing? Contact our Head Office via email at enquiries@brooklandsgroup.co.uk or give us a call on 0800 292 23 25 Alternatively fill in the form below –